Saturday 1 June 2013

Risk Assessment - Scapegoat


LIKELIHOOD
CONSEQUENCES
Insignificant
Minor
Moderate
Major
Catastrophic

Almost Certain


HIGH

HIGH

EXTREME

EXTREME

EXTREME

Likely


MODERATE

HIGH

HIGH

EXTREME

EXTREME

Moderate


LOW

MODERATE

HIGH

EXTREME

EXTREME

Unlikely


LOW

LOW

MODERATE

HIGH

EXTREME

Rare


LOW

LOW

MODERATE

HIGH

HIGH


Risks
Prevention
Cables lying around
Make sure all cables anything tangled up are safely put away when not being used
Overheating
Turn off all electricals when not in use
Blocked fire exits
Keep clear of all fire exits
Liquid products near electrical equipment
Be sure all liquids are kept a safe distance away from the equipment
Blurred out vision
Make sure everyone on set is able to see everything clearly
Lack of space
Double check surrounding conditions are spacious and safe
No knowledge of the premises/on set
Making sure every person is certain of where all the fire exits are and where all fire preventing products are


FILM PRODUCTION RISK ASSESSMENT

Company Name
No Name
Production Title
Scapegoat - Film
Production Date(s)
11-06-13
Producer Name
Zekeria Albostani
Director Name
Zekaria
Date of Risk Assessment
08-06-13
Risk Assessment conducted by
Siddique Koroma & Zekeria Albostani


Hazard
Persons who may be harmed
Property which may be damaged
Risk controls already in place
Risk Assessment LOW, MODERATE, HIGH, EXTREME
(see table)
Further action required to control risk ***
Corridor's


Actors & Crew



n/a
Shooting only when the students are clear

MODERATE
Shooting on a corridor where everyone is gone and free. 
Loose walls and pavement


Actors & Crew



Equipment
Checking the walls and pavements for any looseness

HIGH
Finding another interior place or location with steady walls and pavements.
Slipperiness


Actors & Crew



Equipment
Testing for slipperiness before rehearsals or takes

HIGH
Shooting on days with guaranteed. A dry environment would be essential.
Strong wind & Rainfall


Actors & Crew



Equipment & Location (Depending on the climate)
See if the weather is light and calm for production.

HIGH
Make sure the conditions are great to shoot.


ACTION PLAN

Further action(s) required

By Whom
Date Completed

Shooting within the college premises 


Teachers & Students

06-06-13

Finding another street or location with steady walls and pavements


n/a

04-06-13

Shooting on days with guaranteed. A good free corridor within the college would be great

n/a

01-06-13

Make sure the conditions are great to shoot.


Production Manager – Zekaria Al-Bostani

N/A



   

No comments:

Post a Comment