LIKELIHOOD
|
CONSEQUENCES
| ||||
Insignificant
|
Minor
|
Moderate
|
Major
|
Catastrophic
| |
Almost Certain
|
HIGH
|
HIGH
|
EXTREME
|
EXTREME
|
EXTREME
|
Likely
|
MODERATE
|
HIGH
|
HIGH
|
EXTREME
|
EXTREME
|
Moderate
|
LOW
|
MODERATE
|
HIGH
|
EXTREME
|
EXTREME
|
Unlikely
|
LOW
|
LOW
|
MODERATE
|
HIGH
|
EXTREME
|
Rare
|
LOW
|
LOW
|
MODERATE
|
HIGH
|
HIGH
|
Risks
|
Prevention
|
Cables lying around
|
Make sure all cables anything tangled up are safely put away when not being used
|
Overheating
|
Turn off all electricals when not in use
|
Blocked fire exits
|
Keep clear of all fire exits
|
Liquid products near electrical equipment
|
Be sure all liquids are kept a safe distance away from the equipment
|
Blurred out vision
|
Make sure everyone on set is able to see everything clearly
|
Lack of space
|
Double check surrounding conditions are spacious and safe
|
No knowledge of the premises/on set
|
Making sure every person is certain of where all the fire exits are and where all fire preventing products are
|
FILM PRODUCTION RISK ASSESSMENT
Company Name
No Name
| |
Production Title
Scapegoat - Film
|
Production Date(s)
11-06-13 |
Producer Name
Zekeria Albostani
|
Director Name
Zekaria
|
Date of Risk Assessment
08-06-13
|
Risk Assessment conducted by
Siddique Koroma & Zekeria Albostani
|
Hazard
|
Persons who may be harmed
|
Property which may be damaged
|
Risk controls already in place
|
Risk Assessment LOW, MODERATE, HIGH, EXTREME
(see table)
|
Further action required to control risk ***
|
Corridor's
|
Actors & Crew
|
n/a
|
Shooting only when the students are clear
|
MODERATE
|
Shooting on a corridor where everyone is gone and free.
|
Loose walls and pavement
|
Actors & Crew
|
Equipment
|
Checking the walls and pavements for any looseness
|
HIGH
|
Finding another interior place or location with steady walls and pavements.
|
Slipperiness
|
Actors & Crew
|
Equipment
|
Testing for slipperiness before rehearsals or takes
|
HIGH
|
Shooting on days with guaranteed. A dry environment would be essential.
|
Strong wind & Rainfall
|
Actors & Crew
|
Equipment & Location (Depending on the climate)
|
See if the weather is light and calm for production.
|
HIGH
|
Make sure the conditions are great to shoot.
|
ACTION PLAN
Further action(s) required
|
By Whom
|
Date Completed
|
Shooting within the college premises
|
Teachers & Students
|
06-06-13
|
Finding another street or location with steady walls and pavements
|
n/a
|
04-06-13
|
Shooting on days with guaranteed. A good free corridor within the college would be great
|
n/a
|
01-06-13
|
Make sure the conditions are great to shoot.
|
Production Manager – Zekaria Al-Bostani
|
N/A
|
No comments:
Post a Comment